Back
ZFP-13
CRITMoulding · Food Division
AI PredictionRisk Score: 91%
High probability of Mold BD within 48-72 hours
Recommendation: Inspect Gate Bush and Heater elements. Check cooling water flow. Schedule preventive mold cleaning.
91%
failure risk
Temperature
245
°C · limit 230
Hydraulic Pressure
178
bar · limit 170
Cycle Time
14.8
sec · limit 16
Vibration
8.2
Hz · limit 7
Availability (A)
85.2%
Performance (P)
91.5%
Quality (Q)
97.75%
Temperature (°C)
Pressure (bar)
Cycle Time (sec)
Work Order History
| WO Number | Date | Activity Type | Status | Duration (hrs) |
|---|---|---|---|---|
| WO-2025-1842 | 2025-08-12 | Breakdown Mech. | Closed | 5.3 |
| WO-2025-1791 | 2025-08-01 | Preventive Maint. | Closed | 2 |
| WO-2025-1723 | 2025-07-18 | Breakdown Mech. | Closed | 6.1 |
| WO-2025-1680 | 2025-07-05 | Replace | Closed | 1.5 |