Alerts
3 critical · 3 warnings · 5 open
Critical
3
Warnings
3
Open Total
5
CRITICALZFP-13THRESHOLD_BREACH14:32:05
Temperature Zone 1 exceeded 240°C (limit: 230°C). Immediate inspection required.
Temperature: 245°CLimit: 230°COpen
CRITICALROB-001PREDICTIVE_FAILURE13:58:41
AI model predicts Robot BD failure within 24 hours. Probability: 91%. Schedule emergency maintenance.
AI Risk Score: 91%Limit: 80%Open
CRITICALZFP-13THRESHOLD_BREACH14:15:22
Hydraulic pressure exceeded 175 bar (limit: 170 bar). Check hydraulic system.
Pressure: 178 barLimit: 170 barOpen
WARNINGZFP-05PREDICTIVE_FAILURE11:20:33
Degrading performance trend detected. OEE dropped to 72% (threshold: 80%). Review speed losses.
OEE: 72%Limit: 80%Acknowledged
WARNINGZFP-17THRESHOLD_BREACH10:45:18
Temperature Zone 2 at 231°C, approaching limit of 230°C. Monitor closely.
Temperature: 231°CLimit: 230°CAcknowledged
WARNINGZFP-12PREDICTIVE_FAILURE09:30:00
Waste percentage at 3.0%, above target of 2.5%. Check mold condition.
Waste %: 3.0%Limit: 2.5%Open
INFOINJ-086STATUS_CHANGE08:00:00
Machine transitioned to IDLE state. No production order assigned.
Status: IDLELimit: —Resolved
INFOZFP-20MAINTENANCE_DUE07:00:00
Scheduled preventive maintenance due in 3 days (2025-08-18). Spare parts: Sealing Ring, Grease.
PM Schedule: 3 daysLimit: —Open